skip to main | skip to sidebar

SRT251 construction and structures 2

Sunday, June 1, 2008

rafters

tilt-up panels

160 tonne crane getting ready to move a panel into place

spraying "bond breaker" onto a concrete panel made on site

getting ready to make another panel. reinforcemant is in place and formowrk

Posted by matthew at 8:10 PM

No comments:

Post a Comment

Newer Post Older Post Home
Subscribe to: Post Comments (Atom)

Blog Archive

  • ▼  2008 (13)
    • ▼  June (7)
      • here are a few shots of my model for the major ass...
      • ARTICLE 4this article tells us of how the building...
      • The photos of this tilt-up construction building a...
      • rafter connection to plateoverall shot, shoeing ra...
      • again sowing the tilt-up panel in the formwork wit...
      • rafterstilt-up panels 160 tonne crane getting read...
      • Footing for tilt-up panelsshowing the tilt-up pane...
    • ►  May (4)
    • ►  April (1)
    • ►  March (1)

About Me

matthew
View my complete profile